Schutz vor Inselbetrieb vs. Rückspeiseschutz für PV-Anlagen und Energiespeichersysteme

A commercial solar project may need to disconnect from the utility during an outage and limit how much power it exports during normal operation. These are two separate requirements. Understanding the difference helps buyers specify the right protection and control functions before requesting a quotation.

What does anti-islanding protection do?

Unintentional islanding can occur when a section of the electrical system loses its utility connection but on-site generation continues to energize that section. Anti-islanding protection is designed to detect this condition and stop the source from energizing the isolated network.

The project design determines how this function is implemented. It may involve inverter protection, an external relay, or a coordinated scheme. If your utility specifies an external device, include that requirement in your enquiry. View Henghui’s Anti-Islanding Protection Relay.

What does reverse power protection do?

Reverse power protection monitors the direction of active power at a defined measurement point. For example, when a factory’s solar generation exceeds its daytime load, surplus power can flow toward the utility while the grid is still online. Depending on the approved design, a reverse power device can issue an alarm or a trip signal when export exceeds a specified threshold for the configured delay.

If the project calls for continuous export limiting, specify that separately. An export control scheme typically uses feedback from a meter to adjust inverter or storage output as site loads change. A reverse power trip may serve as backup where the project requires it. View Henghui’s Reverse Power Flow Protection Device.

What should you send for a quotation?

  • Single-line diagram, showing the utility connection, metering point, breakers, and PV or storage equipment.
  • System details, including voltage, frequency, PV or storage capacity, and current and voltage transformer ratios where available.
  • Utility and control requirements, including the permitted export limit, required alarm or trip actions, and any specified communication interface.
  • Supply scope, indicating whether you need individual devices or a complete grid connection cabinet, along with quantity and any drawing or test documentation requirements.

If you are still preparing the specification, send the drawings and utility requirements you already have to Kathy at kathy@nbhh-group.com. Henghui can review the project with you and confirm the proposed scope for the quotation. Explore Henghui’s Photovoltaic Grid Connection Cabinet.